IBIS Macromodel Task Group Meeting date: 21 July 2009 Members (asterisk for those attending): Adge Hawes, IBM Ambrish Varma, Cadence Design Systems Anders Ekholm, Ericsson * Arpad Muranyi, Mentor Graphics Corp. Barry Katz, SiSoft * Bob Ross, Teraspeed Consulting Group Brad Brim, Sigrity Brad Griffin, Cadence Design Systems Chris McGrath, Synopsys David Banas, Xilinx Deepak Ramaswany, Ansoft Donald Telian, consultant Doug White, Cisco Systems * Eckhard Lenski, Nokia-Siemens Networks Essaid Bensoudane, ST Microelectronics Fangyi Rao, Agilent Ganesh Narayanaswamy, ST Micro Gang Kang, Sigrity Hemant Shah, Cadence Design Systems Ian Dodd, consultant Jerry Chuang, Xilinx Joe Abler, IBM * John Angulo, Mentor Graphics John Shields, Mentor Graphics Ken Willis, Cadence Design Systems Kumar Keshavan, Sigrity Lance Wang, Cadence Design Systems Luis Boluna, Cisco Systems Michael Mirmak, Intel Corp. * Mike LaBonte, Cisco Systems Mike Steinberger, SiSoft Mustansir Fanaswalla, Xilinx Patrick O'Halloran, Tiburon Design Automation Paul Fernando, NCSU Pavani Jella, TI Radek Biernacki, Agilent (EESof) Randy Wolff, Micron Technology Ray Comeau, Cadence Design Systems Richard Mellitz, Intel Richard Ward, Texas Instruments Samuel Mertens, Ansoft Sam Chitwood, Sigrity Sanjeev Gupta, Agilent Shangli Wu, Cadence Design Systems Sid Singh, Extreme Networks Stephen Scearce, Cisco Systems Steve Pytel, Ansoft Syed Huq, Cisco Systems Syed Sadeghi, ST Micro Ted Mido, Synopsys Terry Jernberg, Cadence Design Systems Todd Westerhoff, SiSoft Vladimir Dmitriev-Zdorov Vikas Gupta, Xilinx Vuk Borich, Agilent * Walter Katz, SiSoft Zhen Mu, Cadence Design Systems ------------------------------------------------------------------------ Opens: - Arpad: We should discuss the BIRDs mentioned last week -------------------------- Call for patent disclosure: - No one declared a patent. ------------- Review of ARs: - Mike change web page to make items easily linkable - In progress - The change is to no longer use frames, which when linked open up a page with only the subframe, not the whole page. - Walter email updated IBIS-ISS document to list - Sent by email after the last meeting - Todd ask Synopsys about public posting of the document - Walter reports that Todd is working on it - Arpad write a BIRD to clarify time period accuracy requirements - TBD - Todd: Write IBIS s-param BIRD - No update - Arpad: Write parameter passing syntax proposal (BIRD draft) for *-AMS models in IBIS that is consistent with the parameter passing syntax of the AMI models - TBD - TBD: Propose a parameter passing syntax for the SPICE - [External ...] also? - TBD - Arpad: Review the documentation (annotation) in the macro libraries. - Deferred until a demand arises or we have nothing else to do ------------- New Discussion: The next meeting will be in 2 weeks due to the IBIS summit next week Arpad showed Walter's presentation for the IBIS summit - Arpad made a few editorial changes - Slide 5: - Arpad: What is meant by "pins" here? - Walter: They are "ports", could be either pins or pads - "IBIS-SPICE" was changed to "IBIS-ISS" in a few places - Slide 7: - We added "All elements must be contained inside one or more subcircuits" - Slide 4: - Mike: The title is EMD, but the slide is about IBIS-ISS - The title was clarified - Slide 1: - Bob: The presentation venue should be listed - Arpad added the venue AR: Arpad send updated IBIS-ISS presentation to Walter Arpad asked if there were comments on the IBIS-ISS specification itself - No comments Next meeting: 4 Aug 2009 12:00pm PT -------- IBIS Interconnect SPICE Wish List: 1) Simulator directives